Khalid Bin Sultan City: AED175m infrastructure contract advances Sharjah masterplan

READY
Read by Emma, the Simply Abu Dhabi narrator.
BEEAH appoints Building Co. (BEST) L.L.C. to deliver essential utilities and systems for the flagship development, with early site works now complete and construction on track for Q4 2028 completion.
The infrastructure backbone of Khalid Bin Sultan City is taking shape. BEEAH has appointed Building Co. (BEST) L.L.C. to deliver a major AED175 million infrastructure package for its flagship Sharjah real estate development, marking a significant progression in the masterplan’s physical realisation. The works are scheduled for completion in Q4 2028.
The contract encompasses approximately 345,500 square metres across Orbits A, B and G within Phase 1, plus site-wide facilities. The infrastructure will include sewerage and stormwater networks, potable and firefighting water systems, irrigation and gas networks, road works, and centralised domestic and fire water tanks and pumping stations. The sewerage network will connect to a dedicated Sewage Treatment Plant, whose recovered treated effluent will irrigate landscaped areas, while the stormwater system incorporates catch basins, pipelines, attenuation tanks and outfall structures.
Sustainability underpins the design. The development targets treatment of all wastewater generated on site for landscape irrigation, alongside 100 per cent capture of stormwater for groundwater aquifer recharge. The specifications support recycled aggregate use and provision of EV charging points for visitors.
Nada Taryam, Chief Executive Officer of Real Estate at BEEAH, said: “Our ambition for Khalid Bin Sultan City is to create a community that enhances quality of life by putting people at the centre of how it is planned and delivered. This infrastructure will form the backbone of the development, supporting connectivity, liveability and access to the essential systems that residents will rely on every day.”
Building Co. (BEST) L.L.C. brings more than five decades of construction expertise in the UAE. Operating since 1975, the company holds ISO 9001, ISO 14001 and ISO 45001 certifications and has delivered residential, healthcare and public infrastructure projects across the emirate, including the Marash Roundabout currently under construction in Kalba. Elie Zgheib, Managing Director of BEST, stated: “We are proud to continue our relationship with BEEAH through this important infrastructure package. With decades of construction experience in the UAE, including extensive delivery across Sharjah, BEST looks forward to applying its engineering capabilities to a project with a clear long-term vision.”
Early works at the site, initiated in June 2026 and encompassing site preparation and earthworks, have now concluded. This milestone marked the project’s transition from planning into physical development and prepared the ground for the infrastructure and construction works now advancing.
The development, masterplanned by Zaha Hadid Architects, is envisioned as a climate-smart, people-centred community integrating residential, commercial and lifestyle components. Its wider masterplan incorporates smart infrastructure, sustainable mobility, pedestrian-friendly public spaces and connected natural environments, with walkable neighbourhoods designed to support wellbeing and community connection.
What it means for Abu Dhabi
Khalid Bin Sultan City represents a significant evolution in Sharjah’s approach to real estate development, emphasising sustainable infrastructure and quality of life alongside growth. The AED175 million infrastructure commitment reflects confidence in Sharjah’s development trajectory and the broader UAE’s capacity to deliver large-scale, environmentally conscious projects.
Sharjah’s real estate sector recorded AED46.8 billion in transactions during the first nine months of 2026, up 5.6 per cent year on year, with the total number of transactions rising 14 per cent, demonstrating robust market momentum across the region. The commitment to treating wastewater on site and capturing stormwater for aquifer recharge establishes a template for sustainable development practices that may inform future projects across the Emirates.
Source: WAM