Dubai completes Al Qudra Road bridge works, expanding capacity by 150 per cent

READY
Read by Emma, the Simply Abu Dhabi narrator.
The Roads and Transport Authority has opened three bridges and two loop ramps at a critical intersection, eliminating seven minutes of journey time and transforming traffic flow across one of the emirate's busiest corridors.
Three bridges and two loop ramps spanning 2,660 metres now connect Al Qudra Road with Sheikh Zayed bin Hamdan Al Nahyan Street, completing the structural works that reshape how traffic moves through one of Dubai’s most heavily used corridors. The opening, completed on Sunday, marks the realisation of a project designed to serve the more than 400,000 residents and visitors who travel through the areas it connects.
The intersection capacity has expanded to 19,400 vehicles per hour, a jump of 150 per cent from its previous 7,800. For drivers, the improvement is immediate: a seven minute reduction in waiting time at this single interchange. The broader Al Qudra Road corridor, which extends from Sheikh Mohammed bin Zayed Road through to Emirates Road, now moves 16,000 vehicles per hour in both directions, up from 12,000, while journey time across the stretch has compressed from ten minutes to three.
The works represent the completion of all bridge construction under the Al Qudra Road Key Intersections Development Project, which has involved the building of 4,750 metres of bridges and the improvement and expansion of 11.6 kilometres of road. The project serves residential communities and development areas including Arabian Ranches 1 and 2, Dubai Motor City, Dubai Studio City, Akoya, Mudon, DAMAC Hills, The Sustainable City, Town Square, Mira and DAMAC Hills 2.
Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of the Roads and Transport Authority, affirmed that the completion represents “a distinctive addition to Dubai’s road network.” He noted that the achievement reflects the authority’s commitment to translating the emirate’s strategic directives into infrastructure that sustains urban growth and enhances the efficiency of the mobility system.
The project builds on earlier phases. Early this year, the RTA opened a 1,200 metre bridge with four lanes in each direction at the intersection of Al Qudra Road and the road linking Arabian Ranches with Dubai Studio City. That bridge increased capacity from 6,600 to 19,200 vehicles per hour and reduced waiting time by approximately 55 per cent, from 113 seconds to 52 seconds. As we reported in our coverage of Dubai’s enhanced truck movement restrictions, the emirate continues to refine its approach to managing freight and passenger flows across its expanding network.
What it means for Abu Dhabi
The Al Qudra Road improvements extend the capacity and connectivity of the Dubai road network, which forms part of the broader Gulf transport system connecting Abu Dhabi to the northern emirates. Enhanced traffic flow on these corridors reduces journey times for residents and workers travelling between the emirates, strengthening economic and social links across the region.
The project reflects the strategic infrastructure development approach adopted across the UAE, prioritising integrated, sustainable systems that support population growth and urban expansion. For Abu Dhabi, the completion of these works demonstrates how coordinated investment in mobility and connectivity drives prosperity and quality of life across the emirate and beyond.
Source: WAM
On Simply Luxury: DAMAC